Controls Engineer III - Integrated Resources, Inc
Hemlock, MI 48626
About the Job
Title: Controls Engineer III
Location: Hemlock, MI
Contract: 1+ Year (Possible of extension)
Shift: 1st Shift
Education: BS in Electrical Engineering
Minimum Experience: 5+ Years
Product of Position:
- This will be a hybrid work assignment with the candidate working remotely and traveling to project site as necessary. Initially the project will be in Michigan.
" A senior controls engineer responsible for providing hands-on electrical support for the installation, start-up and debug manufacturing process equipment. This includes working with a multi-functional team (mechanical, electrical, controls, facilities, IT, operations, etc.)
" Involves commissioning PLC s, drives, sensors, HMI s across a large integrated manufacturing line
Requirements:
" Experience with automated equipment design, install, start-up and debug in a high-volume manufacturing environment
" Familiar with the design and programming of PLC systems primarily Allen Bradley ControlLogix
o Studio 5000, RSLinx, FactoryTalk View
o Configuration and setup of ControlLogix PLC
o Ethernet IP communication
" HMI SCADA iFix minor changes and troubleshooting
" Drive setup and tuning Yaskawa drives
" PID Tuning
" Ability to read and update electrical schematics
" Knowledge of machine guarding and safety practices and standards
" Good written and oral communication skills
" Ability to collaborate and work with diverse teams (skills, gender, culture, race, etc.)
" Capable of multitasking
" Ability to work with minimal direction
" Independently determines and develops approaches to solutions
Key Responsibilities
" Managing electrical trades executing equipment install and debug.
" Verify wiring done to print, answer questions and perform point to point checks
" Setup and commission PLC s, drives, and field I/O
" Perform safety validation checks per SAT documents
" Coordinating installation plan with safety and plant receivers
" Conferring with Client engineers and vendors to resolve equipment install or build discrepancies.
" Ensure safe work practices
" Updating drawings and equipment documentation
Travel Requirements:
" Minimal travel (less than 25%)
" Travel to Client plant sites as needed to support projects
Travel to a supplier or vendor may be required for equipment check-out before shipment.
Work Schedule:
Typical 40 hours per week. May require working weekends/holidays or longer days to support installation schedule
Location: Hemlock, MI
Contract: 1+ Year (Possible of extension)
Shift: 1st Shift
Education: BS in Electrical Engineering
Minimum Experience: 5+ Years
Product of Position:
- This will be a hybrid work assignment with the candidate working remotely and traveling to project site as necessary. Initially the project will be in Michigan.
" A senior controls engineer responsible for providing hands-on electrical support for the installation, start-up and debug manufacturing process equipment. This includes working with a multi-functional team (mechanical, electrical, controls, facilities, IT, operations, etc.)
" Involves commissioning PLC s, drives, sensors, HMI s across a large integrated manufacturing line
Requirements:
" Experience with automated equipment design, install, start-up and debug in a high-volume manufacturing environment
" Familiar with the design and programming of PLC systems primarily Allen Bradley ControlLogix
o Studio 5000, RSLinx, FactoryTalk View
o Configuration and setup of ControlLogix PLC
o Ethernet IP communication
" HMI SCADA iFix minor changes and troubleshooting
" Drive setup and tuning Yaskawa drives
" PID Tuning
" Ability to read and update electrical schematics
" Knowledge of machine guarding and safety practices and standards
" Good written and oral communication skills
" Ability to collaborate and work with diverse teams (skills, gender, culture, race, etc.)
" Capable of multitasking
" Ability to work with minimal direction
" Independently determines and develops approaches to solutions
Key Responsibilities
" Managing electrical trades executing equipment install and debug.
" Verify wiring done to print, answer questions and perform point to point checks
" Setup and commission PLC s, drives, and field I/O
" Perform safety validation checks per SAT documents
" Coordinating installation plan with safety and plant receivers
" Conferring with Client engineers and vendors to resolve equipment install or build discrepancies.
" Ensure safe work practices
" Updating drawings and equipment documentation
Travel Requirements:
" Minimal travel (less than 25%)
" Travel to Client plant sites as needed to support projects
Travel to a supplier or vendor may be required for equipment check-out before shipment.
Work Schedule:
Typical 40 hours per week. May require working weekends/holidays or longer days to support installation schedule
Source : Integrated Resources, Inc