Lean Coach, Director (Last Planner System) - Fluor Corporation
GREENVILLE, SC
About the Job
The Lean Coach -Director is charged with improving the lean thinking and execution capabilities of project teams – spanning front line workers to senior leadership levels. You will be building lean capabilities on projects with complex technical elements, large number of design and construction partners, and distributed execution across the globe. You will be expected to coach and mentor the development of the following competencies primarily:
• Last Planner System, encompassing the following elements
Master Scheduling using Pull Planning
Phase Pull Planning/ Takt Planning
Look Ahead Planning /Make Ready Planning/Takt Planning
Visual management and removal of Constraints
Weekly Work Planning
Daily Huddles of Trade Foreman
Design and development of Visual Production Boards
Daily huddles of Craft workers at the work fronts
Risk Management in Construction
Design of Operations
Application of LPS in Production Design
• Value Stream Mapping when such is necessitated
• Continuous Flow in a heavy industrial construction
• Total Productive Maintenance
• Visual Production management
• 5S
• Standard work
• Leader Standard Work
• Toyota Kata
• Training Within Industry (TWI)
• Quick Changeover
• Obeya /Mission Control
• A3 Problem Solving
• Kaizen
• Last Planner System, encompassing the following elements
Master Scheduling using Pull Planning
Phase Pull Planning/ Takt Planning
Look Ahead Planning /Make Ready Planning/Takt Planning
Visual management and removal of Constraints
Weekly Work Planning
Daily Huddles of Trade Foreman
Design and development of Visual Production Boards
Daily huddles of Craft workers at the work fronts
Risk Management in Construction
Design of Operations
Application of LPS in Production Design
• Value Stream Mapping when such is necessitated
• Continuous Flow in a heavy industrial construction
• Total Productive Maintenance
• Visual Production management
• 5S
• Standard work
• Leader Standard Work
• Toyota Kata
• Training Within Industry (TWI)
• Quick Changeover
• Obeya /Mission Control
• A3 Problem Solving
• Kaizen
Source : Fluor Corporation