Senior Logistician - VTG
Washington, DC 20003
About the Job
VTG is staffing a Senior Logistician for professional support services contract related to the planning, design, construction, delivery, and testing of ships overseen by the Guided Missile Frigate (FFG) Program Office (PMS 515). VTG is tasked with providing these services to PMS 515 at the Washington Navy Yard (WNY), Washington, D.C. and in Marinette, WI. PMS 515, under the Program Executive Office (PEO) Unmanned and Small Combatants (USC), is responsible for designing, procuring, and constructing the Navy's next class of multi-mission Small Surface Combatants. This includes the Constellation Class, named after FFG-62 USS Constellation, which will deliver capabilities to support various fleet operations.
Responsibilities:- Logisticians integrate the spectrum of the logistics processes within the operational, acquisition and wholesale environments.
- Logisticians are responsible for directing the integrated logistics process, developing support policies, procedures and systems, and providing implementation guidance.
- The Logistician prepares and implements directives to ensure effective logistics support, and establishes and enforces standards to ensure that the assigned work force is properly trained and equipped.
- It is the Logistician's duty to develop, initiate, integrate and manage all logistics actions associated with life cycle management of weapon systems, subsystems and equipment.
- Bachelor's degree or Master's degree in any field
- DAU level III Logistician Equivalent
- 10-15 years of experience in logistics
- Naval Logistics Experience
- Acquisition Logistics and Supply Support
- Systems Engineering
- DoD/DoN procedures and Policies (DoD 5000 process)
- Secret Clearance
Contingent upon contract award
Military Friendly
Pay Range: VTG’s estimated starting pay range is $80,000-$110,000 annually, which is a general guideline for the geographic location. When extending an offer, VTG also considers work experience, education, skill level, market considerations and may possibly include contractual requirements which may cause an offer to fall outside of this range